PM demands special mechanisms for Vietnam high-speed railway project

By VNA   October 5, 2024 | 10:00 pm PT
PM demands special mechanisms for Vietnam high-speed railway project
Prime Minister Pham Minh Chinh speaks at a meeting on Oct. 5, 2025. Photo courtesy of Vietnam Government Portal
Prime Minister Pham Minh Chinh on Saturday ordered specific and special mechanisms be devised for the north - south high-speed railway project so that procedures are streamlined and construction duration shortened.

The Ministry of Transport (MoT), together with other ministries and sectors, has studied high-speed railway models of many countries based on which they proposed the north - south route of Vietnam should be 1,541 km long, have a designed speed of 350 km per hour, and comprise 23 passenger stations and five cargo ones.

It should run through 20 provinces and cities, starting at Ngoc Hoi station in Hanoi and end at Thu Thiem station in Ho Chi Minh City. Total investment is estimated at US$67.34 billion.

The ministry suggested that after the National Assembly (NA) approves the investment, bidding should be carried out to select an international advisory body while a survey to compile a pre-feasibility study report implemented in 2025 - 2026. Site clearance, contractor selection, and work on the sub-projects of the Hanoi - Vinh and Nha Trang - HCMC sections will be launched in late 2027. Sub-projects of the Vinh - Nha Trang section will start in 2028 - 2029. The entire route is expected to be completed in 2035.

Chinh, who is also head of the State steering committee for key transport projects, stressed that the north - south high-speed railway project and the railway projects connecting with China hold critical importance to national development.

At the recent 10th session, the 13th Party Central Committee agreed in principle on investing in the north - south high-speed railway project, he noted, demanding ministries and sectors apply themselves to drafting this project to submit it to the Party Central Committee and the National Assembly for consideration, and propose the preparation of resources and other necessary conditions for implementation.

He said this railway will be amphibious, serving both socio-economic development and national defense - security. It must avoid large residential areas, be as straight and cost-saving as possible, and implemented in the fastest possible manner so as to be put into use soon to serve national development.

Besides, the route must be in conformity with the national and sectoral master plans, link with other means of transport like aviation and sea transport while connecting with domestic economic corridors and regional countries such as China, Laos, and Cambodia, he went on.

The government leader also asked for reviewing total investment to ensure precision and considering specific and special mechanisms for this project, especially in terms of resource mobilization, procedures, and policies on land, site clearance, and building materials in order to ensure that procedures are streamlined and construction duration shortened.

He pointed out the need to promoting cooperation with international partners to make use of financial sources, receive technologies transferred, train human resources, and improve governance capacity to guarantee the safest and most scientific and effective operations of the route.

At the meeting, PM Chinh also ordered the railway projects connecting Vietnam with China be accelerated, namely Lao Cai - Hanoi - Hai Phong, Hanoi - Lang Son, and Mong Cai - Ha Long - Hai Phong.

The Lao Cai - Hanoi - Hai Phong route is about 380 km long and has an estimated investment of $11.6 billion. Passenger and cargo trains will run at 160 km per hour.

About 156 km long, the Hanoi - Lang Son route will be invested with about $6 billion in total. Both passenger and cargo trains on this route will also run at 160 km per hour.

Meanwhile, the Mong Cai - Ha Long - Hai Phong is about 187 km long and invested with $7 billion. Passenger and cargo trains will operate at 160 km per hour and 120 km per hour, respectively.

All these three railways will use a track gauge of 1,435 mm.

 
 
go to top